by paneldecontrol | Jun 20, 2016
Land and water surface valuation of the service zone of the port of Tarragona (2009) This study was ordered by the Port Authority of Tarragona to determine the tax base of ther field which belongs to the service zone of the Port. Port land valuation Determining of the...
by paneldecontrol | Jun 14, 2016
Land and water surface valuation of the service zone of the Port of Bilbao (2012) This study was ordered by the Port Authority of Bilbao to determine the tax base of the field in the service zone of the Port. Port land valuation Determining of the land valuation in...
by paneldecontrol | Jun 14, 2016
Land valuation of the “Bilbao Port” Logistic-Industrial estate (2013) This study was ordered by the Port Authority of Bilbao in order to determine the rental value of the “Bilbao Port” Logistic-Industrial estate land in the municipality of...
by paneldecontrol | Jun 14, 2016
Detour of the Beas and Trigueros towns in the road M-435, from the K.P. 205,8 until the 218,8 (2011) The works consist in executing the detour of the Beas and Trigueros towns in the road N-435, from the K.P. 205,8 until the 218,8, ending nearly the connection with the...
by paneldecontrol | Apr 5, 2016
Basic/Plan Project (Phase 2) Marina Real Juan Carlos I, Puerto de Valencia The main goal of this project, which are performed in cooperation with the Company Cotenaval, is to carry out a quay-dike use change in the south basin of the Marina Real Juan Carlos I....